Selected projects.
Systems in operation.

A closer look at the controls, safety, security and marine systems ESI has engineered—and continues to support.

Mater Dei Hospital
Healthcare

Mater Dei Hospital

SCADABMS24/7 support

A hospital-wide SCADA and building-management platform gives the engineering team central visibility across plant, air-handling systems, wards, alarms and fire interfaces. ESI continues to support, modify and extend the system across an estate of approximately 250,000 m², with more than 825 beds and 25 operating theatres.

SmartCity Malta office buildings
Commercial campus

SmartCity Malta

Tridium NiagaraTenant billingBEMS

A Tridium Niagara campus platform brings HVAC, lighting, energy monitoring and tenant billing into one operational view. Automated kWh calculations replace fragmented readings, while facilities teams retain central supervision of the wider building, security and backup-power infrastructure.

Malta Marriott Hotel
Hospitality

Malta Marriott

REMSBMSRoom controls

Room energy management and the central BMS were delivered as one coordinated platform. Occupancy, air conditioning, lighting and guest-room controls are connected to head-end monitoring, helping the engineering team see room status, identify faults and manage comfort and energy performance from a single system.

The Point Shopping Mall
Retail

The Point

NiagaraEnergy billingHVAC

ESI automated tenant energy billing through a Niagara-based platform while integrating common-area air-conditioning and lighting controls. The system replaces fragmented manual readings with consistent metering data and gives the facilities team a practical view of consumption and day-to-day building operation.

Malta Life Sciences Park exterior
Life sciences · Controls

Malta Life Sciences Park

Niagara migrationBMSIntegration

A multi-building controls modernisation brought existing plant and distributed controllers onto a renewed Niagara supervisory platform. The migration was planned around a live research and laboratory campus, preserving operational continuity while improving central visibility, alarm handling and future system support.

HI-FOG high-pressure water mist system demonstration
Life sciences · Fire safety

Malta Life Sciences Park

HI-FOGWater mistLife safety

Specialist HI-FOG high-pressure water-mist engineering adds a low-water fire-protection solution for sensitive laboratory and research areas. ESI supports the system as part of the wider life-safety environment, with engineering centred on reliability, testing and long-term serviceability.

FIMBank head office building
Financial services

FIMBank Head Office

BEMSDALI lightingSecurity

An IP-based building and security solution connects HVAC control, DALI lighting, biometric access, intrusion detection and voice alarm systems within a live financial-services headquarters. The integrated approach gives the facilities and security teams coordinated monitoring while keeping each discipline purpose-built for its role.

Parliament House in Valletta
Government

Parliament of Malta

CCTVAccess controlIntrusion

ESI delivered integrated security around Honeywell Pro-Watch, supporting more than 50 CCTV cameras and over 40 controlled doors. The project combines live video, access events and intrusion monitoring for a sensitive government environment, backed by structured maintenance and ongoing technical support.

Gasco Energy and Liquigas facility in Malta
Energy and industry

Gasco Energy

SCADAFire & gasCCTV

ESI designed and delivered the integrated process-control and safety platform for Gasco's LPG storage and bottling facility. The Siemens and Dräger solution covers more than 500 I/O points and over 50 fire-and-gas field devices, including automated emergency shutdowns, ATEX-area installations and the vessel-transfer interface; ESI has also completed CCTV upgrades and continued site engineering support.

National Lottery flagship outlet in Malta
Gaming and retail

National Lottery

500+ camerasNVR systemsMulti-site estate

More than 500 cameras are distributed across National Lottery outlets, offices and gaming locations. ESI manages the multi-site CCTV estate from survey and equipment selection through installation, commissioning and NVR configuration, then continues with additions, repairs and upgrades as locations change.

Motor yacht Samar in Malta
Superyacht · Safety service

M/Y Samar

DrägerGas detectionAnnual calibration

Annual inspection and calibration cover the yacht's fixed gas-detection system and portable Dräger X-am 2500 units. ESI tests the equipment, records its condition and provides the servicing continuity needed to keep safety devices ready for operation onboard.

Motor yacht Lady Goodgirl in Malta
Superyacht

M/Y Lady Goodgirl

Electrical surveySingle-line diagramsAs-built records

For the 43-metre classic superyacht, ESI carried out a complete AC and DC electrical condition survey and rebuilt the technical record from the installation itself. Single-line diagrams, panel schedules and load mapping now provide an as-found baseline for redesign, refit and long-term maintenance.

Wastewater treatment plant equipment
Water and environmental engineering

FM Environmental

Control panelsTreatment systemsMarine

ESI engineers and builds controls and electrical panels for FM Environmental treatment equipment, including D5 and D5M packages used in marine wastewater applications. The scope translates each treatment process into a practical panel, control sequence and supportable electrical solution.

Laferla Insurance office sign
Commercial offices · In progress

Laferla Insurance Offices

BMSDALI-2M&E integration

An ongoing multi-level office programme combines M&E services, BMS, DALI-2 lighting controls, electrical distribution and backup-power planning across six office areas. ESI is coordinating design, execution, testing and commissioning as further floors and phases are brought into the integrated system.

Projects, maintenance and specialist services.

One engineering team.
Across the complete system.

Contact ESI